Indian Oil Corporation Limited - Haryana

37865982 bids are invited for oxygen detector portable 9519253014 (q3) , portable so2 monitor 9519250904 (q3) , chlorine gas responder 9544156672 (q3) , ammonia gas responder 9544156652 (q3) total quantity : 261...

Meham Cooperative Sugar Mills Limited - Haryana

37667958 tender for fabrication jobs for season 2023 24. 1 fabrication jobs 2 pipelines [m.s./ g.i.] dismantling up to12 including bends, reducers, flanges etc. 3 pipelines [m.s./ g.i.] erection up to 2 dia. 4 pipelines [m.s./ g.i.] do above 2 to 12 dia. 5 dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) 6 m.s pipe line above 12 dia. dismantling 7 m.s pipe line above 12 dia. fabrication 8 m.s pipe line above 12 dia. erection 9 dismantling of flanges/ blind for reuse 10 refitting of old flanges/blind[reuse] new 11 fabrication of flanges/blind from m. s. plate 12 valves dismantling & fitting up to 6 size 13 valves dismantling & fittingfrom 7 to 12 size 14 valves dismantling & fitting above 12 size 15 dismantling & fittingof ms fabricated right angle/ globe valve of size more than 12 size 16 dismantling & fitting of c.i. pipe &accessories 17 dismantling& fitting of s.s.pipe & accessories. 18 dismantling of ms bend, tee, nipple, reducer above 12 19 fabrication of ms bend, tee, nipple, reducer above 12 20 erection of ms bend, tee, nipple, reducer above 12 21 dismantling, fab. & erection of m.s./s.s. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) 22 dismantling, fab. & erection of m.s. plate jobs (tanks, gutters, chutes pipe rolling, boiler ducting etc.) 23 dis./fab./erection of internal structure of wet scrubber. 24 dismantling of structure work (staging, columns,trusses & pipes support, purline, new platform etc.) 25 fabrication of structure work (staging, columns,trusses & pipes support, purline, new platform etc.) 26 erection of structure work (staging, columns,trusses & pipes support, purline, new platform etc.) 27 repairing of old platform dismantling,fab.&erection 28 dismantling, fab.& erectionof railing 29 patch work upto 4 sq. ft. max. 30 patch work above 4 sq. ft. welding work ( two round ) 31 fabrication and erection of condensate pit. 32 dismantling, fabrication and erection of molasses conditional with coil and drive system. 33 strengthening of quad bodies. 34 dismantling, fabrication and erection of hopper. 35 dismantling, erection and commissioning of pan condenser 36 dismantling and erection of air compressor’s tank 37 repairing of id fan for boiler side. 38 dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter 39 dismantling, fitting & hydraulic testing of s.s. tubes (semi kestnner, juice heaters ) 40 dismantling, fitting & hydraulic testing of s.s. tubes (vapour cell & evaporator bodies) 41 dismantling, fitting & hydraulic testing of s.s /brass tubes ( pans ) 42 dismantling, fabrication & erection of pan and quad down take 43 dismantling, fab. & erection of pan and quad calanderia jacket. 44 dismantling of up to 4 pump & 15 hp motor. 45 erection of up to 4 pump & 15 hp motor. 46 dismantling of 4” to 8” pump & 15 to 40 h.p.motor 47 erection of 4” to 8” pump & 15 to 40 h.p.motor 48 dismantling of above 8” pump & above 40 h.p.motor 49 erection of above 8” pump & above 40 h.p.motor 50 dismantlingof g.i./ a.c.c. sheet 51 fitting (erection) of g.i./ a.c.c. sheet 52 dismantling of water gutter & ridge 53 erection of water gutter & ridge 54 dismantling, fabrication, erection of sulphur furnace complete 55 dismantling, fab. & erection of the melter/ receiver of sulphur furnace. 56 dismantling, fabrication & erectionof shell of sulphur furnace 57 dismantling, fabrication & erectionof scrubber of sulphur furnace 58 dismantling , fabrication & erectionof steam jacket of sulphur furnace 59 dismantling, fabrication, erection of sulphur furnace cooler 60 dismantling, fabrication & erection of the bottom portion of weight juice tank with ms plates 61 dismantling, fabrication & erection of the scrappers of dorr clarifier with ms plates 62 dismantling, fabrication & erection of the catcher bottle of vac. filter with ms plates 63 dismantling, fabrication & erection of the bottom of dorr clarifier with ms plates 64 dismantling, fabrication & erection of the mud tray of vac. filter with ms plates 65 dismantling, fabrication & erection of the mud tank bottom of vac. filter with ms plates 66 dismantling, fabrication & erection of the conical portion of juice/ water/ mud tank with ms plates 67 dismantling, fabrication & erection of ms plates of pan station shell of pans 68 dismantling, fabrication & erection of ms plates of pan station pan tops 69 dismantling, fabrication & erection of ms plates of pan station saveall 70 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 71 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 72 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 73 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels/ angles/ ms plate rings 74 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels/ angles/ ms plate rings 75 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles/ pipes 76 dismantling, fab. & erection of coils of horizontal crystallizers 77 dismantling of shaft of crystallizers 78 fabrication of shaft of crystallizers 79 erectionof shaft of crystallizers 80 replacement of 3” ms coils (including bends, flange, etc.) of vertical crystallizers 81 dismantling, fab. & erection of arms of a crystallizers 82 replacement of coils of dorr & evaporator bodies juice coils (dismantling, fab. & erection) 83 replacement of coils of dorr & evaporator bodies ammonia & gas coils (dismantling, fab. & erection) 84 replacement of weak ms plates & cooling coils of molasses tanks bottom plates 85 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 86 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 87 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 88 dismantling, fabrication, erection of ms pipe coil fitting at various station 89 fabrication of drum internal plates of boiler 90 dismantling, fabrication and erection of expansion joints of boiler 91 dismantling of existing transient heaters 92 shifting of new transient heater at site 93 erection of new/ existing transient heaters 94 dismantling/ fab./ erection of weak portion of partition plates ofjuice heaters 95 dis./ repairing/ fabrication & erection of bagasse belt conveyor on turnkey basis 96 dismantlingofspurgar of juice sulphitor for cleaning 97 fabricationofspurgar of juice sulphitor for cleaning 98 erection/refitting.ofspurgar of juice sulphitor for cleaning 99 dis, fab & erection of stainer of injection pump/spray pump 100 injection channel jail dismantling, fab. & erection. 101 repairing of agitator of vaccum filter dismantling, fab. & erection. 102 fabrication of sweeper trolly 103 repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape 104 etp middle shaft repairing/ replacement 105 fab of new lime tank with its shaft, stirer etc. at etp 106 dismantling, fab & erection of save all ofevaporator bodies 107 replacement of juice sulphiter top 108 dismantling of vibro screen 109 fabriaction of vibro screen 110 erection of vibro screen 111 repairing/ replacement of shell of sugar melter 112 replacement of shaft of sugar melter 113 replacemnet of arm of sugar melter 114 stair case ( with chequared plate) dismentling 115 stair case ( with chequared plate) fabrication 116 stair case ( with chequared plate) erection 117 juice heater cover dismantling, fab. & erection 118 juice heater refitting with testingby pump. 119 sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. 120 stair case at sugar bin fabrication & erection. 121 new planatory gear boxes for b massecuite crystallizer. 122 f.d. old impeller is to be removed and new is to be fitted and trial. 123 straightening of old pipe line of thickness 6 8mm into plain sheet by rolling machine 124 pan no. 4 mechanical circulator is to be dismantled and parts to be shifted to w 125 pan no. 4 mechanical circulagtoris to be dismantled and parts to be shifted to workshop for machining.after machining the same circulator parts to be fitted and trial. 126 rori melter is to be fabricated and erected as per drg. 127 replacement of id fan ducting & casing. 128 ss condenser repairing by support to be given by rings 129 clear juice filter arrangement by jali fitting dismantling, fabrication, erection 130 dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 131 juice heater header partition plate top & bottom both side dismantling, fabrication, erection 132 oliver filter tray dismantling, fabrication, erection 133 centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam 134 dismantling, erection of ss tail pipe at pan & quad condenser 135 dismantling, fabrication, erection tail pipe support angle channel 136 dismantling, fabrication, erectionof complete pug mill for continuous machine b massecuite. 137 repairing of bottom portion of hot water tank replacement 138 sf melter and receiver steam jacket and its coil 139 dismantling, fabrication, erection of so2 gas coil/pipe at syrup sulphiter 140 dismantling of condensate pit 141 dismantling, fabrication and erection of top and shell of quad body 142 dismantling, fabrication and erection of wt. juice tank 143 dismantling, fabrication and erection of maceration water tank 144 dismantling, fabrication and erection of feed water tank 145 dismantling, fabrication and erection of wet scrubber 146 dismantling, fabrication and erection of boiler furnace 147 dismantling, fabrication and erection of any type of reduction gear box/ planetary gear boxwith bed & motor. 148 dismantling, fabrication and erection of mud & juice kush kush and any type conveyor. 149 dismantling, fabrication and erection of casing of any type of conveyor. 150 dismantling, fabrication and erection of mud and juice boxes. 151 dismantling and erection of double beat valves. 152 unloading of iron & steel, pipes 153 loading & unloading of oxygen cylinder 154 shifting, removing and lowering of any type of submersible pump with motor. 155 dismantling, fabrication & erectionof save all of any evaporator body 156 dismantling, fabrication & erectionof top cone of any evaporator body 157 fabrication, fitting of tufr plumber blocks and cutting of health stocks accordling as per first mill. 158 dismantling, fabrication & erection of bed for any pump/motor/fan/ gearbox etc. of any size ...

Meham Cooperative Sugar Mills Limited - Haryana

36926879 tender for fabrication jobs for season 2023 24. 1 fabrication jobs 2 pipelines [m.s./ g.i.] dismantling up to12 including bends, reducers, flanges etc. 3 pipelines [m.s./ g.i.] erection up to 2 dia. 4 pipelines [m.s./ g.i.] do above 2 to 12 dia. 5 dismantling,cleaning, burning & refitting of existing pipe lines of all sizes (for cleaning & modification purposes) 6 m.s pipe line above 12 dia. dismantling 7 m.s pipe line above 12 dia. fabrication 8 m.s pipe line above 12 dia. erection 9 dismantling of flanges/ blind for reuse 10 refitting of old flanges/blind[reuse] new 11 fabrication of flanges/blind from m. s. plate 12 valves dismantling & fitting up to 6 size 13 valves dismantling & fittingfrom 7 to 12 size 14 valves dismantling & fitting above 12 size 15 dismantling & fittingof ms fabricated right angle/ globe valve of size more than 12 size 16 dismantling & fitting of c.i. pipe &accessories 17 dismantling& fitting of s.s.pipe & accessories. 18 dismantling of ms bend, tee, nipple, reducer above 12 19 fabrication of ms bend, tee, nipple, reducer above 12 20 erection of ms bend, tee, nipple, reducer above 12 21 dismantling, fab. & erection of m.s./s.s. pipe accessories(tee,cone,cross,distance piece, nipple, reducer, bend) 22 dismantling, fab. & erection of m.s. plate jobs (tanks, gutters, chutes pipe rolling, boiler ducting etc.) 23 dis./fab./erection of internal structure of wet scrubber. 24 dismantling of structure work (staging, columns,trusses & pipes support, purline, new platform etc.) 25 fabrication of structure work (staging, columns,trusses & pipes support, purline, new platform etc.) 26 erection of structure work (staging, columns,trusses & pipes support, purline, new platform etc.) 27 repairing of old platform dismantling,fab.&erection 28 dismantling, fab.& erectionof railing 29 patch work upto 4 sq. ft. max. 30 patch work above 4 sq. ft. welding work ( two round ) 31 fabrication and erection of condensate pit. 32 dismantling, fabrication and erection of molasses conditional with coil and drive system. 33 strengthening of quad bodies. 34 dismantling, fabrication and erection of hopper. 35 dismantling, erection and commissioning of pan condenser 36 dismantling and erection of air compressor’s tank 37 repairing of id fan for boiler side. 38 dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter 39 dismantling, fitting & hydraulic testing of s.s. tubes (semi kestnner, juice heaters ) 40 dismantling, fitting & hydraulic testing of s.s. tubes (vapour cell & evaporator bodies) 41 dismantling, fitting & hydraulic testing of s.s /brass tubes ( pans ) 42 dismantling, fabrication & erection of pan and quad down take 43 dismantling, fab. & erection of pan and quad calanderia jacket. 44 dismantling of up to 4 pump & 15 hp motor. 45 erection of up to 4 pump & 15 hp motor. 46 dismantling of 4” to 8” pump & 15 to 40 h.p.motor 47 erection of 4” to 8” pump & 15 to 40 h.p.motor 48 dismantling of above 8” pump & above 40 h.p.motor 49 erection of above 8” pump & above 40 h.p.motor 50 dismantlingof g.i./ a.c.c. sheet 51 fitting (erection) of g.i./ a.c.c. sheet 52 dismantling of water gutter & ridge 53 erection of water gutter & ridge 54 dismantling, fabrication, erection of sulphur furnace complete 55 dismantling, fab. & erection of the melter/ receiver of sulphur furnace. 56 dismantling, fabrication & erectionof shell of sulphur furnace 57 dismantling, fabrication & erectionof scrubber of sulphur furnace 58 dismantling , fabrication & erectionof steam jacket of sulphur furnace 59 dismantling, fabrication, erection of sulphur furnace cooler 60 dismantling, fabrication & erection of the bottom portion of weight juice tank with ms plates 61 dismantling, fabrication & erection of the scrappers of dorr clarifier with ms plates 62 dismantling, fabrication & erection of the catcher bottle of vac. filter with ms plates 63 dismantling, fabrication & erection of the bottom of dorr clarifier with ms plates 64 dismantling, fabrication & erection of the mud tray of vac. filter with ms plates 65 dismantling, fabrication & erection of the mud tank bottom of vac. filter with ms plates 66 dismantling, fabrication & erection of the conical portion of juice/ water/ mud tank with ms plates 67 dismantling, fabrication & erection of ms plates of pan station shell of pans 68 dismantling, fabrication & erection of ms plates of pan station pan tops 69 dismantling, fabrication & erection of ms plates of pan station saveall 70 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 71 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 72 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 73 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels/ angles/ ms plate rings 74 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels/ angles/ ms plate rings 75 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles/ pipes 76 dismantling, fab. & erection of coils of horizontal crystallizers 77 dismantling of shaft of crystallizers 78 fabrication of shaft of crystallizers 79 erectionof shaft of crystallizers 80 replacement of 3” ms coils (including bends, flange, etc.) of vertical crystallizers 81 dismantling, fab. & erection of arms of a crystallizers 82 replacement of coils of dorr & evaporator bodies juice coils (dismantling, fab. & erection) 83 replacement of coils of dorr & evaporator bodies ammonia & gas coils (dismantling, fab. & erection) 84 replacement of weak ms plates & cooling coils of molasses tanks bottom plates 85 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 86 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 87 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 88 dismantling, fabrication, erection of ms pipe coil fitting at various station 89 fabrication of drum internal plates of boiler 90 dismantling, fabrication and erection of expansion joints of boiler 91 dismantling of existing transient heaters 92 shifting of new transient heater at site 93 erection of new/ existing transient heaters 94 dismantling/ fab./ erection of weak portion of partition plates ofjuice heaters 95 dis./ repairing/ fabrication & erection of bagasse belt conveyor on turnkey basis 96 dismantlingofspurgar of juice sulphitor for cleaning 97 fabricationofspurgar of juice sulphitor for cleaning 98 erection/refitting.ofspurgar of juice sulphitor for cleaning 99 dis, fab & erection of stainer of injection pump/spray pump 100 injection channel jail dismantling, fab. & erection. 101 repairing of agitator of vaccum filter dismantling, fab. & erection. 102 fabrication of sweeper trolly 103 repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape 104 etp middle shaft repairing/ replacement 105 fab of new lime tank with its shaft, stirer etc. at etp 106 dismantling, fab & erection of save all ofevaporator bodies 107 replacement of juice sulphiter top 108 dismantling of vibro screen 109 fabriaction of vibro screen 110 erection of vibro screen 111 repairing/ replacement of shell of sugar melter 112 replacement of shaft of sugar melter 113 replacemnet of arm of sugar melter 114 stair case ( with chequared plate) dismentling 115 stair case ( with chequared plate) fabrication 116 stair case ( with chequared plate) erection 117 juice heater cover dismantling, fab. & erection 118 juice heater refitting with testingby pump. 119 sight glass fitting in condensate bottle of seed & juice heaters/ any vessel,by welding the sight glass. 120 stair case at sugar bin fabrication & erection. 121 new planatory gear boxes for b massecuite crystallizer. 122 f.d. old impeller is to be removed and new is to be fitted and trial. 123 straightening of old pipe line of thickness 6 8mm into plain sheet by rolling machine 124 pan no. 4 mechanical circulator is to be dismantled and parts to be shifted to w 125 pan no. 4 mechanical circulagtoris to be dismantled and parts to be shifted to workshop for machining.after machining the same circulator parts to be fitted and trial. 126 rori melter is to be fabricated and erected as per drg. 127 replacement of id fan ducting & casing. 128 ss condenser repairing by support to be given by rings 129 clear juice filter arrangement by jali fitting dismantling, fabrication, erection 130 dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 131 juice heater header partition plate top & bottom both side dismantling, fabrication, erection 132 oliver filter tray dismantling, fabrication, erection 133 centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam 134 dismantling, erection of ss tail pipe at pan & quad condenser 135 dismantling, fabrication, erection tail pipe support angle channel 136 dismantling, fabrication, erectionof complete pug mill for continuous machine b massecuite. 137 repairing of bottom portion of hot water tank replacement 138 sf melter and receiver steam jacket and its coil 139 dismantling, fabrication, erection of so2 gas coil/pipe at syrup sulphiter 140 dismantling of condensate pit 141 dismantling, fabrication and erection of top and shell of quad body 142 dismantling, fabrication and erection of wt. juice tank 143 dismantling, fabrication and erection of maceration water tank 144 dismantling, fabrication and erection of feed water tank 145 dismantling, fabrication and erection of wet scrubber 146 dismantling, fabrication and erection of boiler furnace 147 dismantling, fabrication and erection of any type of reduction gear box/ planetary gear boxwith bed & motor. 148 dismantling, fabrication and erection of mud & juice kush kush and any type conveyor. 149 dismantling, fabrication and erection of casing of any type of conveyor. 150 dismantling, fabrication and erection of mud and juice boxes. 151 dismantling and erection of double beat valves. 152 unloading of iron & steel, pipes 153 loading & unloading of oxygen cylinder 154 shifting, removing and lowering of any type of submersible pump with motor. 155 dismantling, fabrication & erectionof save all of any evaporator body 156 dismantling, fabrication & erectionof top cone of any evaporator body 157 dismantling, fabrication & erection of bed for any pump/motor/fan/ gearbox etc. of any size ...

Meham Cooperative Sugar Mills Limited - Haryana

32563541 tender for fabrication jobs for season 2022 23. pipelines [ m.s. / g.i. ] dismantling up to12 including bends, reducers, flanges etc. 3 pipelines [ m.s. / g.i. ] erection up to 2 dia. 4 pipelines [ m.s. / g.i. ] do above 2 to 12 dia. 5 dismantling, cleaning, burning & refitting of existing pipe lines of all sizes ( for cleaning & modification purposes ) 6 m.s pipe line above 12 dia. dismantling 7 m.s pipe line above 12 dia. fabrication 8 m.s pipe line above 12 dia. erection 9 dismantling of flanges / blind for reuse 10 refitting of old flanges / blind [ reuse ] new 11 fabrication of flanges / blind from m. s. plate 12 valves dismantling & fitting up to 6 size 13 valves dismantling & fittingfrom 7 to 12 size 14 valves dismantling & fitting above 12 size 15 dismantling & fittingof ms fabricated right angle / globe valve of size more than 12 size 16 dismantling & fitting of c.i. pipe &accessories 17 dismantling& fitting of s.s.pipe & accessories. 18 dismantling of ms bend, tee, nipple, reducer above 12 19 fabrication of ms bend, tee, nipple, reducer above 12 20 erection of ms bend, tee, nipple, reducer above 12 21 dismantling, fab. & erection of m.s. / s.s. pipe accessories ( tee, cone, cross, distance piece, nipple, reducer, bend ) 22 dismantling, fab. & erection of m.s. plate jobs ( tanks, gutters, chutes pipe rolling, boiler ducting etc. ) 23 dis. / fab. / erection of internal structure of wet scrubber. 24 dismantling of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 25 fabrication of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 26 erection of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 27 repairing of old platform dismantling, fab.&erection 28 dismantling, fab.& erectionof railing 29 patch work upto 4 sq. ft. max. 30 patch work above 4 sq. ft. welding work ( two round ) 31 fabrication and erection of condensate pit. 32 dismantling, fabrication and erection of molasses conditional with coil and drive system. 33 strengthening of quad bodies. 34 dismantling, fabrication and erection of hopper. 35 dismantling, erection and commissioning of pan condenser 36 dismantling and erection of air compressor’s tank 37 repairing of id fan for boiler side. 38 dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter 39 dismantling, fitting & hydraulic testing of s.s. tubes ( semi kestnner, juice heaters ) 40 dismantling, fitting & hydraulic testing of s.s. tubes ( vapour cell & evaporator bodies ) 41 dismantling, fitting & hydraulic testing of s.s / brass tubes ( pans ) 42 dismantling, fabrication & erection of pan and quad down take 43 dismantling, fab. & erection of pan and quad calanderia jacket. 44 dismantling of up to 4 pump & 15 hp motor. 45 erection of up to 4 pump & 15 hp motor. 46 dismantling of 4” to 8” pump & 15 to 40 h.p.motor 47 erection of 4” to 8” pump & 15 to 40 h.p.motor 48 dismantling of above 8” pump & above 40 h.p.motor 49 erection of above 8” pump & above 40 h.p.motor 50 dismantlingof a.c.c. sheet 51 fitting ( erection ) ofa.c.c. sheet 52 dismantling of water gutter & ridge 53 erection of water gutter & ridge 54 dismantling, fabrication, erection of sulphur furnace complete 55 dismantling, fab. & erection of the melter / receiver of sulphur furnace. 56 dismantling, fabrication & erectionof shell of sulphur furnace 57 dismantling, fabrication & erectionof scrubber of sulphur furnace 58 dismantling , fabrication & erectionof steam jacket of sulphur furnace 59 dismantling, fabrication, erection of sulphur furnace cooler 60 dismantling, fabrication & erection of the bottom portion of weight juice tank with ms plates 61 dismantling, fabrication & erection of the scrappers of dorr clarifier with ms plates 62 dismantling, fabrication & erection of the catcher bottle of vac. filter with ms plates 63 dismantling, fabrication & erection of the bottom of dorr clarifier with ms plates 64 dismantling, fabrication & erection of the mud tray of vac. filter with ms plates 65 dismantling, fabrication & erection of the mud tank bottom of vac. filter with ms plates 66 dismantling, fabrication & erection of the conical portion of juice / water / mud tank with ms plates 67 dismantling, fabrication & erection of ms plates of pan station shell of pans 68 dismantling, fabrication & erection of ms plates of pan station pan tops 69 dismantling, fabrication & erection of ms plates of pan station saveall 70 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 71 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 72 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 73 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels / angles / ms plate rings 74 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels / angles / ms plate rings 75 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles / pipes 76 dismantling, fab. & erection of coils of horizontal crystallizers 77 dismantling of shaft of crystallizers 78 fabrication of shaft of crystallizers 79 erectionof shaft of crystallizers 80 replacement of 3” ms coils ( including bends, flange, etc. ) of vertical crystallizers 81 dismantling, fab. & erection of arms of a crystallizers 82 replacement of coils of dorr & evaporator bodies juice coils ( dismantling, fab. & erection ) 83 replacement of coils of dorr & evaporator bodies ammonia & gas coils ( dismantling, fab. & erection ) 84 replacement of weak ms plates & cooling coils of molasses tanks bottom plates 85 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 86 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 87 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 88 dismantling, fabrication, erection of ms pipe coil fitting at various station 89 fabrication of drum internal plates of boiler 90 dismantling, fabrication and erection of expansion joints of boiler 91 dismantling of existing transient heaters 92 shifting of new transient heater at site 93 erection of new / existing transient heaters 94 dismantling / fab. / erection of weak portion of partition plates ofjuice heaters 95 dis. / repairing / fabrication & erection of bagasse belt conveyor on turnkey basis 96 dismantlingofspurgar of juice sulphitor for cleaning 97 fabricationofspurgar of juice sulphitor for cleaning 98 erection / refitting.ofspurgar of juice sulphitor for cleaning 99 dis, fab & erection of stainer of injection pump / spray pump 100 injection channel jail dismantling, fab. & erection. 101 repairing of agitator of vaccum filter dismantling, fab. & erection. 102 fabrication of sweeper trolly 103 repairing / changing of vertical crystallizer arms in top gutter ( scrapper type ) round shape 104 etp middle shaft repairing / replacement 105 fab of new lime tank with its shaft, stirer etc. at etp 106 dismantling, fab & erection of save all ofevaporator bodies 107 replacement of juice sulphiter top 108 dismantling of vibro screen 109 fabriaction of vibro screen 110 erection of vibro screen 111 repairing / replacement of shell of sugar melter 112 replacement of shaft of sugar melter 113 replacemnet of arm of sugar melter 114 stair case ( with chequared plate ) dismentling 115 stair case ( with chequared plate ) fabrication 116 stair case ( with chequared plate ) erection 117 juice heater cover dismantling, fab. & erection 118 juice heater refitting with testingby pump. 119 sight glass fitting in condensate bottle of seed & juice heaters / any vessel, by welding the sight glass. 120 stair case at sugar bin fabrication & erection. 121 new planatory gear boxes for b massecuite crystallizer. 122 f.d. old impeller is to be removed and new is to be fitted and trial. 123 straightening of old pipe line of thickness 6 8mm into plain sheet by rolling machine 124 pan no. 4 mechanical circulator is to be dismantled and parts to be shifted to w 125 pan no. 4 mechanical circulagtoris to be dismantled and parts to be shifted to workshop for machining.after machining the same circulator parts to be fitted and trial. 126 rori melter is to be fabricated and erected as per drg. 127 replacement of id fan ducting & casing. 128 ss condenser repairing by support to be given by rings 129 clear juice filter arrangement by jali fitting dismantling, fabrication, erection 130 dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 131 juice heater header partition plate top & bottom both side dismantling, fabrication, erection 132 oliver filter tray dismantling, fabrication, erection 133 centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam 134 dismantling, erection of ss tail pipe at pan & quad condenser 135 dismantling, fabrication, erection tail pipe support angle channel 136 dismantling, fabrication, erectionof complete pug mill for continuous machine b massecuite. 137 repairing of bottom portion of hot water tank replacement 138 sf melter and receiver steam jacket and its coil 139 dismantling, fabrication, erection of so2 gas coil / pipe at syrup sulphiter 140 dismantling of condensate pit 141 dismantling, fabrication and erection of top and shell of quad body 142 dismantling, fabrication and erection of wt. juice tank 143 dismantling, fabrication and erection of maceration water tank 144 dismantling, fabrication and erection of feed water tank 145 dismantling, fabrication and erection of wet scrubber 146 dismantling, fabrication and erection of boiler furnace 147 dismantling, fabrication and erection of any type of reduction gear box / planetary gear boxwith bed & motor. 148 dismantling, fabrication and erection of mud & juice kush kush and any type conveyor. 149 dismantling, fabrication and erection of casing of any type of conveyor. 150 dismantling, fabrication and erection of mud and juice boxes. 151 dismantling and erection of double beat valves. 152 unloading of iron & steel, pipes 153 loading & unloading of oxygen cylinder 154 shifting, removing and lowering of any type of submersible pump with motor....

Haryana Dairy Development Cooperative Federation Limited - Haryana

31967246 automation & expansion of existing refrigeration plant 1 high stage compressor for cold store kirloskar / fric or equivalent reputed make. 2 cyclone type oil separator model osw 150 40 flanged connections with companion flanges and oil drain valve 3 abb / siemens make 40 hp, 4 pole, ie2, ip 55, class f insulation, ambient 50°c, imb3 mount, tefc sq. cage induction motor suitable for electric supply of 3ph x 415v x 50hz, ac supply with slide rails for compressor. 4 l&t / equiv make star delta starter for the above motors. 5 alfa laval / equiv. make semi welded phe type water cooled ammonia condenser. 6 advance / equiv. make cooling tower for circulation of water through phe condenser. 7 lubi / equiv. make centrifugal pumps suitable capacity of water through chiller against 24 m head. the pump will be complete with coupling, coupling guard, motor, base frame and foundation bolts. 8 ammonia receiver of size 20” dia. x 12’ long constructed with liquid inlet and outlet valves, safety valve, charging valve, drain valve, purge valve, pressure gauge and gauge glass with valves. 9 alfa laval make semi welded phe type water chiller with accumulator. 10 water chiller controls liquid line solenoid valve liquid level controller digital temp. indicator chilled flow switch bprv 11 ms ‘c’ class refrigerant pipes, pipe fittings and ammonia valves to interconnect above equipment in the system comprising of suction, discharge, liquid and oil lines as per pid and based on compact plant layout. 12 g.i ‘b’ class pipes, pipefitting and valves for condenser make up water, cylinder head cooling defrost and drain line piping as per pid and based on assumption that condenser shall be placed at a distance have not more than 10 m from the plant room. 13 puf insulation for accumulators / vessel, suction line, liquid lines and wet return lines with fixing material bitumen / cprx compound and aluminum cladding of 26g with in battery limit. 14 structural material for pipe installation and plat form piping support to be fabricated and installed at site with steel channel and steel angle distance between the supports to be approx. 5 meters, with variance depend on the building condition. 15 mcc panel will be cubical type switchboard with bus bar, incoming acb, indicating lamps, push buttons, switches, fuses, voltmeters, voltmeter switch, ammeters, ammeters switch and starter fora ) compressors motor, b ) condenser fan motor & pump, c ) cooling coil fan motor, 16 16. power & control cabling with cable tray for complete refrigeration plant. up to 3 hp copper unarmored cable above 3 hp aluminum armored cable 17 manual gas purger with safety valve for purging non condensable gases from the system. 18 first charge of ammonia gas and lubricant compressor oil. 19 lubi / equiv. make monobloc centrifugal pump set of suitable capacity for compressor jacket cooling. 20 installation, testing & commissioning of the complete refrigeration plant and putting in operation. our scope is as follows: joberection of the equipment as per our layout with proper operation and alignmentconnecting various equipment’s with pipelines, fittings, controls and instrumentspainting of equipment & pipingpressure testing, charging of gas and commissioning of the plant. 21 5 amp 2 way switch ( hsr code no. 23.8.11.2 ) 22 15 amp 1 way switch ( hsr code no. 23.8.11.3 ) 23 5 amp socket ( hsr code no. 23.8.11.4 ) 24 15 amp 6 pin socket ( hsr code no. 23.8.11.5 ) 25 supply and erection of 25mm pvc conduit isi marked ( medium ) recessed in walvceiling etc. including the cost of pvc bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of engineer in charge of work ( hsr code no. 23.7.6.2 ) ...

Meham Cooperative Sugar Mills Limited - Haryana

31579557 fabrication jobs 2 pipelines [ m.s. / g.i. ] dismantling up to12 including bends, reducers, flanges etc. 3 pipelines [ m.s. / g.i. ] erection up to 2 dia. 4 pipelines [ m.s. / g.i. ] do above 2 to 12 dia. 5 dismantling, cleaning, burning & refitting of existing pipe lines of all sizes ( for cleaning & modification purposes ) 6 m.s pipe line above 12 dia. dismantling 7 m.s pipe line above 12 dia. fabrication 8 m.s pipe line above 12 dia. erection 9 dismantling of flanges / blind for reuse 10 refitting of old flanges / blind [ reuse ] new 11 fabrication of flanges / blind from m. s. plate 12 valves dismantling & fitting up to 6 size 13 valves dismantling & fittingfrom 7 to 12 size 14 valves dismantling & fitting above 12 size 15 dismantling & fittingof ms fabricated right angle / globe valve of size more than 12 size 16 dismantling & fitting of c.i. pipe &accessories 17 dismantling& fitting of s.s.pipe & accessories. 18 dismantling of ms bend, tee, nipple, reducer above 12 19 fabrication of ms bend, tee, nipple, reducer above 12 20 erection of ms bend, tee, nipple, reducer above 12 21 dismantling, fab. & erection of m.s. / s.s. pipe accessories ( tee, cone, cross, distance piece, nipple, reducer, bend ) 22 dismantling, fab. & erection of m.s. plate jobs ( tanks, gutters, chutes pipe rolling, boiler ducting etc. ) 23 dis. / fab. / erection of internal structure of wet scrubber. 24 dismantling of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 25 fabrication of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 26 erection of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 27 repairing of old platform dismantling, fab.&erection 28 dismantling, fab.& erectionof railing 29 patch work upto 4 sq. ft. max. 30 patch work above 4 sq. ft. welding work ( two round ) 31 fabrication and erection of condensate pit. 32 dismantling, fabrication and erection of molasses conditional with coil and drive system. 33 strengthening of quad body no. 3 and no. 4. 34 dismantling, fabrication and erection of hopper. 35 dismantling, fabrication and erection of hopper. 36 dismantling, erection and commissioning of pan condenser 37 dismantling and erection of air compressor’s tank 38 repairing of id fan for boiler side. 39 dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter 40 dismantling, fitting & hydraulic testing of s.s. tubes ( semi kestnner, juice heaters ) 41 dismantling, fitting & hydraulic testing of s.s. tubes ( vapour cell & evaporator bodies ) 42 dismantling, fitting & hydraulic testing of s.s / brass tubes ( pans ) 43 dismantling, fabrication & erection of pan and quad down take 44 dismantling, fab. & erection of pan and quad calanderia jacket. 45 dismantling of up to 4 pump & 15 hp motor. 46 erection of up to 4 pump & 15 hp motor. 47 dismantling of 4” to 8” pump & 15 to 40 h.p.motor 48 erection of 4” to 8” pump & 15 to 40 h.p.motor 49 dismantling of above 8” pump & above 40 h.p.motor 50 erection of above 8” pump & above 40 h.p.motor 51 dismantlingof g.i. / a.c.c. sheet 52 fitting ( erection ) of g.i. / a.c.c. sheet 53 dismantling of water gutter & ridge 54 erection of water gutter & ridge 55 dismantling, fabrication, erection of sulphur furnace complete 56 dismantling, fab. & erection of the melter / receiver of sulphur furnace. 57 dismantling, fabrication & erectionof shell of sulphur furnace 58 dismantling, fabrication & erectionof scrubber of sulphur furnace 59 dismantling , fabrication & erectionof steam jacket of sulphur furnace 60 dismantling, fabrication, erection of sulphur furnace cooler 61 dismantling, fabrication & erection of the bottom portion of weight juice tank with ms plates 62 dismantling, fabrication & erection of the scrappers of dorr clarifier with ms plates 63 dismantling, fabrication & erection of the catcher bottle of vac. filter with ms plates 64 dismantling, fabrication & erection of the bottom of dorr clarifier with ms plates 65 dismantling, fabrication & erection of the mud tray of vac. filter with ms plates 66 dismantling, fabrication & erection of the mud tank bottom of vac. filter with ms plates 67 dismantling, fabrication & erection of the conical portion of juice / water / mud tank with ms plates 68 dismantling, fabrication & erection of ms plates of pan station shell of pans 69 dismantling, fabrication & erection of ms plates of pan station pan tops 70 dismantling, fabrication & erection of ms plates of pan station saveall 71 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 72 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 73 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 74 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels / angles / ms plate rings 75 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels / angles / ms plate rings 76 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles / pipes 77 dismantling, fab. & erection of coils of horizontal crystallizers 78 dismantling of shaft of crystallizers 79 fabrication of shaft of crystallizers 80 erectionof shaft of crystallizers 81 replacement of 3” ms coils ( including bends, flange, etc. ) of vertical crystallizers 82 dismantling, fab. & erection of arms of a crystallizers 83 replacement of coils of dorr & evaporator bodies juice coils ( dismantling, fab. & erection ) 84 replacement of coils of dorr & evaporator bodies ammonia & gas coils ( dismantling, fab. & erection ) 85 replacement of weak ms plates & cooling coils of molasses tanks bottom plates 86 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 87 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 88 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 89 dismantling, fabrication, erection of ms pipe coil fitting at various station 90 fabrication of drum internal plates of boiler 91 dismantling, fabrication and erection of expansion joints of boiler 92 dismantling of existing transient heaters 93 shifting of new transient heater at site 94 erection of new / existing transient heaters 95 dismantling / fab. / erection of weak portion of partition plates ofjuice heaters 96 dis. / repairing / fabrication & erection of bagasse belt conveyor on turnkey basis 97 dismantlingofspurgar of juice sulphitor for cleaning 98 fabricationofspurgar of juice sulphitor for cleaning 99 erection / refitting.ofspurgar of juice sulphitor for cleaning 100 dis, fab & erection of stainer of injection pump / spray pump 101 injection channel jail dismantling, fab. & erection. 102 repairing of agitator of vaccum filter dismantling, fab. & erection. 103 fabrication of sweeper trolly 104 repairing / changing of vertical crystallizer arms in top gutter ( scrapper type ) round shape 105 etp middle shaft repairing / replacement 106 fab of new lime tank with its shaft, stirer etc. at etp 107 dismantling, fab & erection of save all ofevaporator bodies 108 replacement of juice sulphiter top 109 dismantling of vibro screen 110 fabriaction of vibro screen 111 erection of vibro screen 112 repairing / replacement of shell of sugar melter 113 replacement of shaft of sugar melter 114 replacemnet of arm of sugar melter 115 stair case ( with chequared plate ) dismentling 116 stair case ( with chequared plate ) fabrication 117 stair case ( with chequared plate ) erection 118 juice heater cover dismantling, fab. & erection 119 juice heater refitting with testingby pump. 120 sight glass fitting in condensate bottle of seed & juice heaters / any vessel, by welding the sight glass. 121 dismantling, fabrication, erection of stainer of injection and spray pump 122 stair case at sugar bin fabrication & erection. 123 vaccum crystallizer shell fabrication, erection& patch. 124 new planatory gear boxes for b massecuite crystallizer. 125 f.d. old impeller is to be removed and new is to be fitted and trial. 126 straightening of old pipe line of thickness 6 8mm into plain sheet by rolling machine 127 pan no. 4 mechanical circulator is to be dismantled and parts to be shifted to w 128 pan no. 4 mechanical circulagtoris to be dismantled and parts to be shifted to workshop for machining.after machining the same circulator parts to be fitted and trial. 129 pan / quad condenser tail pipe double support is to be provided with atleast l 3” / pipe 2.1 / 2” with clamp system. 130 rori melter is to be fabricated and erected as per drg. 131 replacement of id fan ducting & casing. 132 ss condenser repairing by support to be given by rings 133 clear juice filter arrangement by jali fitting dismantling, fabrication, erection 134 dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 135 juice heater header partition plate top & bottom both side dismantling, fabrication, erection 136 oliver filter tray dismantling, fabrication, erection 137 centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam 138 dismantling, erection of ss tail pipe at pan & quad condenser 139 dismantling, fabrication, erection tail pipe support angle channel 140 dismantling, fabrication, erectionof complete pug mill for continuous machine b massecuite. 141 repairing of bottom portion of hot water tank replacement 142 dismantling, fabrication, erection of sulphur furnace no. 2, complete scrubber with its internal pipes. 143 dismantling, fabrication, erection of sulphur furnace no. 3 ( lime side ) complete scrubber with its internal pipes. 144 sf melter and receiver steam jacket and its coil 145 dismantling, fabrication, erection of so2 gas coil / pipe at syrup sulphiter 146 dismantling, fabrication, erection of save all at spare body of quad 147 dismantling of condensate pit 148 dismantling, fabrication and erection of top and shell of quad body 149 dismantling, fabrication and erection of wt. juice tank 150 dismantling, fabrication and erection of maceration water tank 151 dismantling, fabrication and erection of feed water tank 152 dismantling, fabrication and erection of wet scrubber 153 dismantling, fabrication and erection of boiler furnace...

Haryana Dairy Development Cooperative Federation Limited - Haryana

31373008 automation of existing referigeration plant automation of existing referigeration plant , high stage compressor for cold store kirloskar/fric or equivalent reputed make. , cyclone type oil separator model osw 150 40 flanged connections with companion flanges and oil drain valve , abb/ siemens make 40 hp, 4 pole, ie2, ip 55, class f insulation, ambient 50°c, imb3 mount, tefc sq. cage induction motor suitable for electric supply of 3ph x 415v x 50hz, ac supply with slide rails for compressor. , l&t/ equiv make star delta starter for the above motors. , alfa laval / equiv. make semi welded phe type water cooled ammonia condenser. , advance / equiv. make cooling tower for circulation of water through phe condenser. , lubi / equiv. make centrifugal pumps suitable capacity of water through chiller against 24 m head. the pump will be complete with coupling, coupling guard, motor, base frame and foundation bolts. , ammonia receiver of size 20” dia. x 12’ long constructed with liquid inlet and outlet valves, safety valve, charging valve, drain valve, purge valve, pressure gauge and gauge glass with valves. , alfa laval make semi welded phe type water chiller with accumulator. , water chiller controls liquid line solenoid valve liquid level controller digital temp. indicator chilled flow switch bprv , ms ‘c’ class refrigerant pipes, pipe fittings and ammonia valves to interconnect above equipment in the system comprising of suction, discharge, liquid and oil lines as per pid and based on compact plant layout. , g.i ‘b’ class pipes, pipefitting and valves for condenser make up water, cylinder head cooling defrost and drain line piping as per pid and based on assumption that condenser shall be placed at a distance have not more than 10 m from the plant room. , puf insulation for accumulators/vessel, suction line, liquid lines and wet return lines with fixing material bitumen/ cprx compound and aluminum cladding of 26g with in battery limit. , structural material for pipe installation and plat form piping support to be fabricated and installed at site with steel channel and steel angle distance between the supports to be approx. 5 meters, with variance depend on the building condition. , mcc panel will be cubical type switchboard with bus bar, incoming acb, indicating lamps, push buttons, switches, fuses, voltmeters, voltmeter switch, ammeters, ammeters switch and starter fora) compressors motor, b) condenser fan motor & pump, c) cooling coil fan motor, , 16. power & control cabling with cable tray for complete refrigeration plant. up to 3 hp copper unarmored cable above 3 hp aluminum armored cable , manual gas purger with safety valve for purging non condensable gases from the system. , first charge of ammonia gas and lubricant compressor oil. , lubi / equiv. make monobloc centrifugal pump set of suitable capacity for compressor jacket cooling. , installation, testing & commissioning of the complete refrigeration plant and putting in operation. our scope is as follows: job erection of the equipment as per our layout with proper operation and alignment connecting various equipment’s with pipelines, fittings, controls and instruments painting of equipment & piping pressure testing, charging of gas and commissioning of the plant. , 5 amp 2 way switch (hsr code no. 23.8.11.2) , 15 amp 1 way switch (hsr code no. 23.8.11.3) , 5 amp socket (hsr code no. 23.8.11.4) , 15 amp 6 pin socket (hsr code no. 23.8.11.5) , supply and erection of 25mm pvc conduit isi marked (medium) recessed in walvceiling etc. including the cost of pvc bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of engineer in charge of work (hsr code no. 23.7.6.2)...

Public Health Engineering Department - Haryana

30715101 tender for sampla town, estimate for construction of 1 no boosting station and laying of pipeline in newly approved balance area in sampla town distt rohtak, “providing and fixing of gaseous type chlorination system / plant with 3 year maintenance at old water works sampla town and all other works contingent theretodesigning, providing, fixing, commissioning and testing of gas chlorinator (make equa/w&t/supreme technology) system with technology kit, parts, cl12 yoke vaccum regulator, rotameter housing 3 control unit flow meter 0.2 2 kg/ h as designed having the control of gas upto 20th part of maximimum dose and which can start working automatically on switching on the supply of water complete in all respect with comprehensive maintenance period of three years of complete system. the complete system consists of (a) vaccum regulator (b) measuring glass tube (c) injector (d) p/f tubing (e) spanner with cylinder opening key (f) ammonia gas liquid for leaking test (g) 1 dia pvc pipe with pvc fitting ball valves, etc (h) 2 no chlorine gas cylinder capacity 100 kg duly certified and approved by bis and explosive department govt of india (i) electronic chlorine gas leak detector with sensor and hooter (j) eye googles (k) mask with cansiter...

Meham Cooperative Sugar Mills Limited - Haryana

27503523 tender for fabrication jobs 2 pipe lines [ m.s. / g.i. ] dismantling up to12 including bends, reducers, flanges etc. 3 pipe lines [ m.s. / g.i. ] erection up to 2 dia. 4 pipe lines [ m.s. / g.i. ] do above 2 to 12 dia. 5 dismantling, cleaning, burning & refitting of existing pipe lines of all sizes ( for cleaning & modification purposes ) 6 m.s pipe line above 12 dia. dismantling 7 m.s pipe line above 12 dia. fabrication 8 m.s pipe line above 12 dia. erection 9 dismantling of flanges / blind for reuse 10 refitting of old flanges / blind [ reuse ] new 11 fabrication of flanges / blind from m. s. plate 12 valves dismantling & fitting up to 6 size 13 valves dismantling & fittingfrom 7 to 12 size 14 valves dismantling & fitting above 12 size 15 dismantling & fitting of ms fabricated right angle / globe valve of size more than 12 size 16 dismantling & fitting of c.i. pipe &accessories 17 dismantling& fitting of s.s.pipe & accessories. 18 dismantling of ms bend, tee, nipple, reducer above 12 19 fabrication of ms bend, tee, nipple, reducer above 12 20 erection of ms bend, tee, nipple, reducer above 12 21 dismantling, fab. & erection of m.s. / s.s. pipe accessories ( tee, cone, cross, distance piece, nipple, reducer, bend ) 22 dismantling, fab. & erection of m.s. plate jobs ( tanks, gutters, chutes pipe rolling, boiler ducting etc. ) 23 dis. / fab. / erection of internal structure of wet scrubber. 24 dismantling of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 25 fabrication of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 26 erection of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 27 repairing of old platform dismantling, fab.&erection 28 dismantling, fab. & erection of railing 29 patch work upto 4 sq. ft. max. 30 patch work above 4 sq. ft. welding work ( two round ) 31 dismantling, fab. & erection of plumber blocks holding structure ( complete ) for tail shafts of rake type carriers, b.e. & b.c. 32 dismantling & erection of chain roller covering runners at bends of troughs including ribs. 33 dismantling, fab. & erection of m.s. side & bottom plate jobs ( rake carrier, cc, be, bc, rbc trough, donnelly chute, fibrizor, cane leveller, kicker, juice screen box, juice screen tray, bagacillo casing etc. 34 fabrication & erection of new discharge chute for mill no. 1, 2 & 3 35 fabrication & erection of new discharge chute for mill no. 4. 36 rake carrier, c.c., b.e., b.c., r.b.c troughs, donnelly chute dismantling & fitting of runners of various chain. 37 rake carrier, c.c., b.e., b.c., r.b.c troughs, donnelly chute dismantling & fitting of side angles 38 shifting of cane carrier trough side plate about 25 mm towards outside & alignment to avoid wear & tear of side plates 39 to shift cane carrier runner beam according to alignment 40 dismantling& erection of cane carrier runner beam 41 fabrication & erection of top cover gear & pinion guard for cane carrier 42 rake carrier, c.c., b.e., b.c., r.b.c fabrication & erection of tail end sprocket wheel 43 fabrication & erection of maceration water tray at 4th mill 44 fabrication & erection of imbibition juice tray for mill no. 1, 2 45 dismantling , fabrication & erection of imbibition juice distributor 46 fabrication of ms cover for mill bottom bearing ( journal size dia 430mmx540mm ) 47 cane unloaders dismantling of square bar ( size 2 ) runner . 48 cane unloaders fitting of square bar size 2” runner at cane unloader 49 cane unloaders fabrication & fitting of m.s. plate 10 mm thk. ( appx. ) at cane unloaders 300 mm gantary channel 50 cane unloaders to provide horizontal support of gantary beam with vertical column using channel piece 100 mmx1.3 m length 51 cane unloaders to provide vertical support of gantary beam ( 200 mm ) using channel piece 150 mmx780 mm length 52 cane unloaders dismantling, fab. & erection of gantary ( span 10 meters ) 53 erection of new i beam 200 mm between 24 meters span at cane unloaders for chain blocks 54 cleaning, welding of cane unloader bridge wheel 55 cleaning, welding of cane unloader trolley wheel 56 fab & erection of new donnelly chute 57 replacement of side boxes ( dis., fab / erection ) for runners at rack carrier troughs 58 dismantling, fabrication and erection of rake carrier troughs bottom from 12mm plate and side plate=8mm. 59 dismantling, fabrication and erection of beds ( for reduction gear and motor ) 60 bagacillo screens fabrication & erection. 61 dismantling of bagassecillo screens 62 fabrication of crown pinion gear guard 63 repair of transmission gear guard. 64 fabrication and erection of transmission gear guard top cover 65 fabrication and erection of transmission gear guard bottom cover 66 fabrication and erection of transmission gears bed 67 strengthening of mill house crane bridge structure with 6 mm thk .ms plate between upper & lower beam 68 fabrication of d.s.m. screens juice boxes. 69 hard facing of trash plates teeth side and top surface. 70 dis, fab& erection of scroll of screw conveyor for dsm screen 71 fabrication & erection of complete casing of screw conveyor 72 replacement of bottom juice collecting tray of dsm screw conveyor casing ( dis, fab& erection ) 73 tufr build up of existing tufr tips with m.s. electrodes 74 tufr hardfacing of existing of tufr tips 75 through out welding except holes of mills tufr shell 76 fabrication and erection of mill juice tray alongwith discharge pipe. 77 fabrication, erection& commissioning of bagasse drier at 4th mill’s discharge chute complete including staging, bed, alignmentetc, 78 cleaning, welding & grinding of teeth sprockets as per profile sprocket c.c. / b.c. 79 cleaning, welding & grinding of teeth of sprockets as per profile rack carrier sprocket 80 cleaning, welding & grinding of teeth of pinion as per profile pinion 22 teeth under feed roller drive ( one side of teeth ) 81 cleaning, welding & grinding of teeth of pinion as per profile pinion 17 teeth of under feed roller ( one side ) 82 chevron groove cutting in rollers. 83 cane carrier to be covered with 3mm m.s. plate on top upto desired length with hinges and angles bolted 84 blower fan with alignment fabrication, errection & commissioning. 85 fabrication & erection of donnellychute top cover folding type 86 blower fan casing dismantling, fab, erection 87 dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter 88 dismantling, fitting & hydraulic testing of s.s. tubes ( semi kestnner, juice heaters ) 89 dismantling, fitting & hydraulic testing of s.s. tubes ( vapour cell & evaporator bodies ) 90 dismantling, fitting & hydraulic testing of s.s / brass tubes ( pans ) 91 dismantling, fabrication & erection of pan and quad down take 92 dismantling, fab. & erection of pan and quad calanderia jacket. 93 dismantling of up to 4 pump & 15 hp motor. 94 erection of up to 4 pump & 15 hp motor. 95 dismantling of 4” to 8” pump & 15 to 40 h.p.motor 96 erection of 4” to 8” pump & 15 to 40 h.p.motor 97 dismantling of above 8” pump & above 40 h.p.motor 98 erection of above 8” pump & above 40 h.p.motor 99 dismantling of g.i. / a.c.c. sheet 100 fitting ( erection ) of g.i. / a.c.c. sheet 101 dismantling of water gutter & ridge 102 erection of water gutter & ridge 103 dismantling, fabrication, erection of sulphur furnace complete 104 dismantling, fab. & erection of the melter / receiver of sulphur furnace. 105 dismantling, fabrication & erection of shell of sulphur furnace 106 dismantling, fabrication & erection of scrubber of sulphur furnace 107 dismantling , fabrication & erection of steam jacket of sulphur furnace 108 dismantling, fabrication, erection of sulphur furnace cooler 109 dismantling, fabrication & erection of the bottom portion of weight juice tank with ms plates 110 dismantling, fabrication & erection of the scrappers of dorr clarifier with ms plates 111 dismantling, fabrication & erection of the catcher bottle of vac. filter with ms plates 112 dismantling, fabrication & erection of the bottom of dorr clarifier with ms plates 113 dismantling, fabrication & erection of the mud tray of vac. filter with ms plates 114 dismantling, fabrication & erection of the mud tank bottom of vac. filter with ms plates 115 dismantling, fabrication & erection of the conical portion of juice / water / mud tank with ms plates 116 dismantling, fabrication & erection of ms plates of pan station shell of pans 117 dismantling, fabrication & erection of ms plates of pan station pan tops 118 dismantling, fabrication & erection of ms plates of pan station saveall 119 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 120 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 121 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 122 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels / angles / ms plate rings 123 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels / angles / ms plate rings 124 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles / pipes 125 dismantling, fab. & erection of coils of horizontal crystallizers 126 dismantling of shaft of crystallizers 127 fabrication of shaft of crystallizers 128 erectionof shaft of crystallizers 129 replacement of 3” ms coils ( including bends, flange, etc. ) of vertical crystallizers 130 dismantling, fab. & erection of arms of a crystallizers 131 replacement of coils of dorr & evaporator bodies juice coils ( dismantling, fab. & erection ) 132 replacement of coils of dorr & evaporator bodies ammonia & gas coils ( dismantling, fab. & erection ) 133 replacement of weak ms plates & cooling coils of molasses tanks bottom plates 134 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 135 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 136 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 137 dismantling, fabrication, erection of ms pipe coil fitting at various station 138 fabrication of drum internal plates of boiler 139 dismantling, fabrication and erection of expansion joints of boiler 140 dismantling of existing transient heaters 141 shifting of new transient heater at site 142 erection of new / existing transient heaters 143 dismantling / fab. / erection of weak portion of partition plates of juice heaters 144 dis. / repairing / fabrication & erection of bagasse belt conveyor on turnkey basis 145 dismantlingofspurgar of juice sulphitor for cleaning 146 fabricationofspurgar of juice sulphitor for cleaning 147 erection / refitting.ofspurgar of juice sulphitor for cleaning 148 dis, fab & erection of stainer of injection pump / spray pump 149 injection channel jail dismantling, fab. & erection. 150 repairing of agitator of vaccum filter dismantling, fab. & erection. 151 fabrication of sweeper trolly 152 repairing / changing of vertical crystallizer arms in top gutter ( scrapper type ) round shape 153 etp middle shaft repairing / replacement 154 fab of new lime tank with its shaft, stirer etc. at etp 155 dismantling, fab & erection of save all of evaporator bodies 156 replacement of juice sulphiter top 157 dismantling of vibro screen 158 fabriaction of vibro screen 159 erection of vibro screen 160 repairing / replacement of shell of sugar melter 161 replacement of shaft of sugar melter 162 replacemnet of arm of sugar melter 163 stair case ( with chequared plate ) dismentling 164 stair case ( with chequared plate ) fabrication 165 stair case ( with chequared plate ) erection 166 labour supply ( per day 8 hours basis ) fitter 167 labour supply ( per day 8 hours basis ) welder 168 labour supply ( per day 8 hours basis ) helper 169 labour supply ( per day 8 hours basis ) khalasi 170 juice heater cover dismantling, fab. & erection 171 juice heater refitting with testing by pump. 172 sight glass fitting in condensate bottle of seed & juice heaters / any vessel, by welding the sight glass. 173 dismantling, fabrication, erection of stainer of injection and spray pump 174 stair case at sugar bin fabrication & erection. 175 vaccum crystallizer shell fabrication, erection& patch. 176 new planatory gear boxes for b massecuite crystallizer. 177 f.d. old impeller is to be removed and new is to be fitted and trial. 178 straightening of old pipe line of thickness 6 8mm into plain sheet by rolling machine 179 to provide slidde gate at b.c. or desired size with rack &pinion. 180 to provide a tapering suit under idler of b.c. to remove the falling bagasse in bagasse year. 181 pan no. 4 mechanical circulator is to be dismantled and parts to be shifted to w 182 pan no. 4 mechanical circulagtoris to be dismantled and parts to be shifted to workshop for machining. after machining the same circulator parts to be fitted and trial. 183 pan / quad condenser tail pipe double support is to be provided with atleast l 3” / pipe 2.1 / 2” with clamp system. 184 rori melter is to be fabricated and erected as per drg. 185 replacement of id fan ducting & casing. 186 ss condenser repairing by support to be given by rings 187 clear juice filter arrangement by jali fitting dismantling, fabrication, erection 188 dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 189 juice heater header partition plate top & bottom both side dismantling, fabrication, erection 190 oliver filter tray dismantling, fabrication, erection 191 centrifugal machine strengthening dismantling, fabrication & fitting from channel, beam 192 dismantling, erection of ss tail pipe at pan & quad condenser 193 dismantling, fabrication, erection tail pipe support angle channel 194 dismantling, fabrication, erectionof complete pug mill for continuous machine b massecuite.v 195 repairing of bottom portion of hot water tank replacement 196 dismantling, fabrication, erection of sulphur furnace no. 2, complete scrubber with its internal pipes. 197 dismantling, fabrication, erection of sulphur furnace no. 3 ( lime side ) complete scrubber with its internal pipes. 198 sf melter and receiver steam jacket and its coil 199 dismantling, fabrication, erection of so2 gas coil / pipe at syrup sulphiter 200 dismantling, fabrication, erection of save all at spare body of quad 201 dismantling of condensate pit 202 dismantling, fabrication and erection of top and shell of quad body 203 dismantling, fabrication and erection of wt. juice tank 204 dismantling, fabrication and erection of maceration water tank 205 dismantling, fabrication and erection of feed water tank 206 dismantling, fabrication and erection of wet scrubber...

Meham Cooperative Sugar Mills Limited - Haryana

25459508 fabrication job. 1 pipe lines [ m.s. / g.i. ] dismantling up to12 including bends, reducers, flanges etc. 2 pipe lines [ m.s. / g.i. ] erection up to 2 dia. 3 pipe lines [ m.s. / g.i. ] do above 2 to 12 dia. 4 dismantling, cleaning, burning & refitting of existing pipe lines of all sizes ( for cleaning & modification purposes ) 5 m.s pipe line above 12 dia. dismantling 6 m.s pipe line above 12 dia. fabrication 7 m.s pipe line above 12 dia. erection 8 dismantling of flanges / blind for reuse 9 refitting of old flanges / blind [ reuse ] new 10 fabrication of flanges / blind from m. s. plate 11 valves dismantling & fitting up to 6 size 12 valves dismantling & fittingfrom 7 to 12 size 13 valves dismantling & fitting above 12 size 14 dismantling & fitting of ms fabricated right angle / globe valve of size more than 12 size 15 dismantling & fitting of c.i. pipe 16 dismantling& fitting of s.s.pipe & accessories. 17 dismantling of ms bend, tee, nipple, reducer above 12 18 fabrication of ms bend, tee, nipple, reducer above 12 19 erection of ms bend, tee, nipple, reducer above 12 20 dismantling, fab. & erection of m.s. / s.s. pipe accessories ( tee, cone, cross, distance piece, nipple, reducer, bend ) 21 dismantling, fab. & erection of m.s. plate jobs ( tanks, gutters, chutes pipe rolling, boiler ducting etc. ) 22 dis. / fab. / erection of internal structure of wet scrubber. 23 dismantling of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 24 fabrication of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 25 erection of structure work ( staging, columns, trusses & pipes support, purline, new platform etc. ) 26 repairing of old platform dismantling, fab.&erection 27 dismantling, fab. & erection of railing 28 patch work upto 4 sq. ft. max. 29 patch work above 4 sq. ft. welding work ( two round ) 30 dismantling, fab. & erection of cane kicker blades 31 dismantling, fab. & erection of cane kicker drum 32 dismantling, fab. & erection of m.s. side & bottom plate jobs ( rake carrier, cc, be, bc, rbc trough donnelly chute, fibrizor, cane leveller, kicker, juice screen box, juice screen tray, bagacillo casing etc. 33 fabrication & erection of new discharge chute for mill no. 1, 2 & 3 34 fabrication & erection of new discharge chute for mill no. 4. 35 rake carrier, c.c., b.e., b.c., r.b.c troughs, donnelly chute dismantling & fitting of runners of various chain. 36 rake carrier, c.c., b.e., b.c., r.b.c troughs, donnelly chute dismantling & fitting of side angles 37 shifting of cane carrier trough side plate about 25 mm towards outside & alignment to avoid wear & tear of side plates 38 dismantling, fab. & erection of cane carrier runner beam 39 rake carrier, c.c., b.e., b.c., r.b.c fabrication & erection of tail end sprocket wheel 40 fabrication & erection of maceration water tray at mill 41 fabrication of ms cover for mill bottom bearing ( journal size dia 430mmx540mm ) 42 cane unloaders dismantling of square bar ( size 2 ) runner . 43 cane unloaders fitting of square bar size 2” runner at cane unloader 44 cane unloaders fabrication & fitting of m.s. plate 10 mm thk. ( appx. ) at cane unloaders 300 mm gantary channel 45 cane unloaders to provide horizontal support of gantary beam with vertical column using channel piece 100 mmx1.3 m length 46 cane unloaders to provide vertical support of gantary beam ( 200 mm ) using channel piece 150 mmx780 mm length 47 cane unloaders dismantling, fab. & erection of gantary ( span 10 meters ) 48 cane unloaders fabrication and erection of bridge gear wheel guard. 49 cleaning, welding of cane unloader bridge wheel 50 cleaning, welding of cane unloader 51 fab & erection of new donnelly chute 52 replacement of side boxes ( dis., fab / erection ) for runners at rack carrier troughs 53 dismantling, fabrication and erection of rake carrier troughs bottom from 12mm plate and side plate=8mm. 54 dismantling, fabrication and erection of beds ( for reduction gear and motor ) 55 bagacillo screens fabrication & erection. 56 dismantling of bagassecillo screens 57 fabrication of crown pinion gear guard 58 repair of transmission gear guard. 59 fabrication and erection of transmission gear guard top cover 60 fabrication and erection of transmission gear guard bottom cover 61 strengthening of mill house crane bridge structure with 6 mm thk .ms plate between upper & lower beam 62 fabrication of d.s.m. screens juice boxes. 63 welding of mill rollers sidesappx. 1.5 width peripheral 64 hard facing of trash plates teeth side and top surface. 65 dis, fab& erection of scroll of screw conveyor for dsm screen 66 fabrication & erection of complete casing of screw conveyor 67 replacement of bottom juice collecting tray of dsm screw conveyor casing ( dis, fab& erection ) 68 tufr build up of existing tufr tips with m.s. electrodes 69 tufr hardfacing of existing of tufr tips 70 through out welding except holes of mills tufr shell 71 fabrication and erection of mill juice tray alongwith discharge pipe. 72 fabrication, erection & commissioning of bagasse drier at 4th mill’s discharge chute complete including staging, bed, alignmentetc 73 cleaning, welding & grinding of teeth sprockets as per profile sprocket c.c. / b.c. 74 cleaning, welding & grinding of teeth of sprockets as per profile rack carrier sprocket 75 cleaning, welding & grinding of teeth of pinion as per profile pinion 22 teeth under feed roller drive ( one side of teeth ) 76 cleaning, welding & grinding of teeth of pinion as per profile pinion 17 teeth of under feed roller ( one side ) 77 chevron groove cutting in rollers. 78 cane carrier to be covered with 3mm m.s. plate on top upto desired length with hinges and angles bolted 79 blower fan with alignment fabrication, errection & commissioning. 80 blower fan with alignment fabrication, errection & commissioning. 81 blower fan casing dismantling, fab, erection 82 dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter 83 dismantling, fitting & hydraulic testing of s.s. tubes ( semi kestnner, juice heaters ) 84 dismantling, fitting & hydraulic testing of s.s. tubes ( vapour cell & evaporator bodies ) 85 dismantling, fitting & hydraulic testing of s.s / brass tubes ( pans ) 86 dismantling, fabrication & erection of pan and quad down take 86 dismantling, fab. & erection of pan and quad calanderia jacket. 88 dismantling of up to 4 pump & 15 hp motor. 89 erection of up to 4 pump & 15 hp motor. 90 dismantling of 4” to 8” pump & 15 to 40 h.p.motor 91 erection of 4” to 8” pump & 15 to 40 h.p.motor 92 dismantling of above 8” pump & above 40 h.p.motor 93 erection of above 8” pump & above 40 h.p.motor 94 dismantling of g.i. / a.c.c. sheet 95 fitting ( erection ) of g.i. / a.c.c. sheet 96 dismantling of water gutter & ridge 97 erection of water gutter & ridge 98 dismantling, fabrication, erection of sulphur furnace complete 99 dismantling, fab. & erection of the melter / receiver of sulphur furnace. 100 dismantling, fabrication & erection of shell of sulphur furnace 101 dismantling, fabrication & erection of scrubber of sulphur furnace 102 dismantling , fabrication & erection of steam jacket of sulphur furnace 103 dismantling, fabrication, erection of sulphur furnace cooler 104 dismantling, fabrication & erection of the bottom portion of weight juice tank with ms plates 105 dismantling, fabrication & erection of the scrappers of dorr clarifier with ms plates 106 dismantling, fabrication & erection of the catcher bottle of vac. filter with ms plates 107 dismantling, fabrication & erection of the bottom of dorr clarifier with ms plates 108 dismantling, fabrication & erection of the mud tray of vac. filter with ms plates 109 dismantling, fabrication & erection of the mud tank bottom of vac. filter with ms plates 110 dismantling, fabrication & erection of the conical portion of juice / water / mud tank with ms plates 111 dismantling, fabrication & erection of ms plates of pan station shell of 112 dismantling, fabrication & erection of ms plates of pan station pan tops 113 dismantling, fabrication & erection of ms plates of pan station saveall 114 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 115 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 116 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 117 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels / angles / ms plate rings 118 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels / angles / ms plate rings 119 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles / pipes 120 dismantling, fab. & erection of coils of horizontal crystallizers 121 dismantling of shaft of crystallizers 122 fabrication of shaft of crystallizers 123 erectionof shaft of crystallizers 124 replacement of 3” ms coils ( including bends, flange, etc. ) of vertical crystallizers 125 dismantling, fab. & erection of arms of a crystallizers 126 replacement of coils of dorr & evaporator bodies juice coils ( dismantling, fab. & erection ) 127 replacement of coils of dorr & evaporator bodies ammonia & gas coils ( dismantling, fab. & erection ) 128 replacement of weak ms plates & cooling coils of molasses tanks 129 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 130 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 131 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 132 dismantling, fabrication, erection of ms pipe coil fitting at various station 133 fabrication of drum internal plates of boiler 134 dismantling, fabrication and erection of expansion joints of boiler 135 dismantling of existing transient heaters 136 shifting of new transient heater at site 137 erection of new / existing transient heaters 138 dismantling / fab. / erection of weak portion of partition plates of juice heaters 139 dis. / repairing / fabrication & erection of bagasse belt conveyor on turnkey basis 140 dismantlingofspurgar of juice sulphitor for cleaning 141 fabricationofspurgar of juice sulphitor for cleaning 142 erection / refitting.ofspurgar of juice sulphitor for cleaning 143 dis, fab & erection of stainer of injection pump / spray pump 144 injection channel jail dismantling, fab. & erection. 145 repairing of agitator of vaccum filter dismantling, fab. & erection. 146 fabrication of sweeper trolly 147 repairing / changing of vertical crystallizer arms in top gutter ( scrapper type ) round shape 148 etp middle shaft repairing / replacement 149 fab of new lime tank with its shaft, 150 dismantling, fab & erection of save all of evaporator bodies 151 replacement of juice sulphiter top 152 dismantling of vibro screen 153 fabriaction of vibro screen 154 erection of vibro screen 155 repairing / replacement of shell of sugar melter 156 replacement of shaft of sugar melter 157 replacemnet of arm of sugar melter 158 stair case ( with chequared plate ) dismentling 159 stair case ( with chequared plate ) fabrication 160 stair case ( with chequared plate ) erection 161 labour supply ( per day 8 hours basis ) fitter 162 labour supply ( per day 8 hours basis ) welder 163 labour supply ( per day 8 hours basis ) helper 164 labour supply ( per day 8 hours basis ) khalasi 165 juice heater cover dismantling, fab. & erection 166 juice heater refitting with testing by pump. 167 sight glass fitting in condensate bottle of seed & juice heaters / any vessel, by welding the sight glass. 168 dismantling, fabrication, erection of stainer of injection and spray pump 169 stair case at sugar bin fabrication & erection. 170 vaccum crystallizer shell fabrication, erection& patch. 171 new planatory gear boxes for b massecuite crystallizer. 172 f.d. old impeller is to be removed and new is to be fitted and trial. 173 straightening of old pipe line of thickness 6 8mm into plain sheet by rolling machine 174 to provide slidde gate at b.c. or desired size with rack &pinion. 175 to provide a tapering suit under idler of b.c. to remove the falling bagasse in bagasse year. 176 pan no. 4 mechanical circulator is to be dismantled and parts to be shifted to w 177 pan no. 4 mechanical circulagtoris to be dismantled and parts to be shifted to workshop for machining. after machining the same circulator parts to be fitted and trial. 178 pan / quad condenser tail pipe double support is to be provided with atleast l 3” / pipe 2.1 / 2” with clamp system. 179 rori melter is to be fabricated and erected as per drg. 180 replacement of id fan ducting & casing. 181 ss condenser repairing by support to be given by rings 182 clear juice filter arrangement by jali fitting dismantling, fabrication, erection 183 dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 184 juice heater header partition plate top & bottom both side dismantling, fabrication, erection 185 oliver filter tray dismantling, fabrication, erection 186 centrifugal machine strengthning dismantling, fabrication & fitting from channel, beam 187 dismantling, erection of ss tail pipe at pan & quad condenser 188 dismantling, fabrication, erection tail pipe support angle channel dismantling, fabrication, erectionof complete pug mill for continuous machine b massecuite. repairing of bottom portion of hot water tank replacement dismantling, fabrication, erection of sulphur furnace no. 2, complete 192 dismantling, fabrication, erection of sulphur furnace no. 3 ( lime side ) complete scrubber with its internal pipes. 193 sf melter and receiver steam jacket and its coil 194 dismantling, fabrication, erection of so2 gas coil / pipe at syrup sulphiter 195 dismantling, fabrication, erection of save all at spare body of quad 196 dismantling of condensate pit tank....

Public Health Engineering Department - Haryana

21586882 tender for balali village providing independent water works at water works dokha hariya: designing, providing, fixing, commissioning and testing of gas chlorinator make regal usa / eco chlor of cit ( usa ) having capacity upto 2000 grams / hrs. as designed having the control of gas upto 20th part of max. dose and which can start working automatically on switching on the supply of water complete in all respects with comprehensive maintenance period of three years of complete system. the complete system consists of ( a ) vacuum regulator ( b ) measuring glass tube ( c ) ejector ( d ) p f tubing ( e ) spanner with cylinder opening key ( f ) ammonia gas ( liquid ) for leaking test ) ( g ) 1 dia. pvc pipe with pvc fitting, ball valves, etc. h ) 2 no.chlorine gas cylinder capacity 100kg duly certified and approved by bis and explosive department govt. of india. ( i ) electronic chlorine gas leak detector with sensor and hooter. ( j ) eye googles ( k ) mask...

Meham Cooperative Sugar Mills Limited - Haryana

21522254 tender for fabrication job 2 pipe lines [ m.s. / g.i. ] dismantling up to12 including bends, reducers, flanges etc. 3 pipe lines [ m.s. / g.i. ] erection up to 2 dia. 4 pipe lines [ m.s. / g.i. ] do above 2 to 12 dia. 5 dismantling, cleaning, burning & refitting of existing pipe lines of all sizes ( for cleaning & modification purposes ) 6 m.s pipe line above 12 dia. dismantling 7 m.s pipe line above 12 dia. fabrication 8 m.s pipe line above 12 dia. erection 9 dismantling of flanges / blind for reuse 10 refitting of old flanges / blind [ reuse ] new 11 fabrication of flanges / blind from m. s. plate 12 valves dismantling & fitting up to 6 size 13 valves dismantling & fittingfrom 7 to 12 size 14 valves dismantling & fitting above 12 size 15 dismantling & fitting of ms fabricated right angle / globe valve of size more than 12 size 16 dismantling & fitting of c.i. pipe &accessories 17 dismantling& fitting of s.s.pipe & accessories. 18 dismantling of ms bend, tee, nipple, reducer above 12 19 fabrication of ms bend, tee, nipple, reducer above 12 20 erection of ms bend, tee, nipple, reducer above 12 21 dismantling, fab. & erection of m.s. / s.s. pipe accessories ( tee, cone, cross, distance piece, nipple, reducer, bend ) 22 dismantling, fab. & erection of m.s. plate jobs ( tanks, gutters, chutes pipe rolling, boiler ducting etc. ) 23 dis. / fab. / erection of internal structure of wet scrubber. 24 repairing of old platform dismantling, fab.&erection 25 patch work up to 4 sq. ft. max. 26 patch work above 4 sq. ft. welding work ( two round ) 27 dismantling, fab. & erection of cane kicker blades 28 dismantling, fab. & erection of cane kicker drum 29 dismantling, fab. & erection of m.s. side & bottom plate jobs ( rake carrier, cc, be, bc, rbc trough donnelly chute, fibrizor, cane leveller, kicker, juice screen, juice screen tray, bagacillo casing etc. 30 fabrication & erection of new discharge chute for mill no. 1, 2 & 3 31 fabrication & erection of new discharge chute for mill no. 4. 32 rake carrier, c.c., b.e., b.c., r.b.c troughs, donnelly chute dismantling & fitting of runners of various chain. 33 rake carrier, c.c., b.e., b.c., r.b.c troughs, donnelly chute dismantling & fitting of side angles 34 strengthening of cane carrier side plates with angles 65x65x10 mm 35 shifting of cane carrier side plate about 50 mm from bottom towards inside appx. 30 meters length & alignment 36 rake carrier, c.c., b.e., b.c., r.b.c troughs, donnelly chute rake carrier drive column strengthening with 10mm m.s. plate throughout the length. 37 rake carrier, c.c., b.e., b.c., r.b.c fabrication & erection of tail end sprocket wheel 38 fabrication & erection of maceration water tray at mill 39 fabrication of ms cover for mill bottom bearing ( journal size dia 430mmx540mm ) 40 cane unloaders dismantling of square bar ( size 2 ) runner . 41 cane unloaders fitting of square bar size 2” runner at cane unloader 42 cane unloaders fabrication & fitting of m.s. plate 10 mm thk. ( appx. ) at cane unloaders 300 mm gantary channel 43 cane unloaders replacement of cane unloaders cabin m.s. plates. 44 cane unloaders fabrication of hydraulic grab finger from 30 mm m.s. plate & fitting 45 cane unloaders fabrication and erection of bridge gear wheel guard. 46 cleaning, welding of cane unloader bridge wheel 47 cleaning, welding of cane unloader trolley wheel 48 fab & erection of new donnelly chute 49 to provide long bend –dismantling, fabrication & fitting at donnelly chute 50 replacement of side boxes ( dis., fab / erection ) for runners at rack carrier troughs 51 dismantling, fabrication and erection of rake carrier troughs bottom from 12mm plate and side plate=8mm. 52 dismantling, fabrication and erection of beds ( for reduction gear and motor ) 53 bagacillo screens fabrication & erection. 54 dismantling of bagassecillo screens 55 fabrication of crown pinion gear guard 56 repair of transmission gear guard. 57 fabrication and erection of transmission gear guard top cover 58 fabrication and erection of transmission gear guard bottom cover 59 strengthening of mill house crane bridge structure with 6 mm thk .ms plate between upper & lower beam 60 fabrication of d.s.m. screens juice boxes. 61 welding of mill rollers sides appx. 1.5 width peripheral 62 arcing of mill rollers 63 hard facing of trash plates teeth side and top surface. 64 dis, fab & erection of scroll of screw conveyor for dsm screen 65 fabrication & erection of complete casing of screw conveyor 66 replacement of bottom juice collecting tray of dsm screw conveyor casing ( dis, fab & erection ) 67 tufr buildup of existing tufr tips with m.s. electrodes 68 tufr hard facing of existing of tufr tips 69 throughout welding except holes of mills tufr shell 70 fabrication and erection of mill juice tray along with discharge pipe. 71 fabrication and erection of cane carrier pinion and gear guard. 72 cleaning, welding & grinding of teeth sprockets as per profile sprocket c.c. / b.c. 73 cleaning, welding & grinding of teeth of sprockets as per profile rack carrier sprocket 74 cleaning, welding & grinding of teeth of pinion as per profile pinion 22 teeth under feed roller drive ( one side of teeth ) 75 cleaning, welding & grinding of teeth of pinion as per profile pinion 17 teeth of under feed roller ( one side ) 76 cane unloader structure strengthening job. 77 chevron groove cutting in rollers. 78 cane carrier to be covered with 3mm m.s. plate on top upto desired length with hinges and angles bolted 79 blower fan with alignment fabrication, errection & commissioning. 80 dismantling, fabrication & erection of bagacillopipe from bagacillo to vacuum filter 81 dismantling, fitting & hydraulic testing of s.s. tubes ( semi kestnner, juice heaters ) 82 dismantling, fitting & hydraulic testing of s.s. tubes ( vapour cell & evaporator bodies ) 83 dismantling, fitting & hydraulic testing of s.s / brass tubes ( pans ) 84 dismantling, fabrication & erection of pan and quad down take 85 dismantling, fab. & erection of pan and quad calanderia jacket. 86 dismantling of up to 4 pump & 15 hp motor. 87 erection of up to 4 pump & 15 hp motor. 88 dismantling of 4” to 8” pump & 15 to 40 h.p.motor 89 erection of 4” to 8” pump & 15 to 40 h.p.motor 90 dismantling of above 8” pump & above 40 h.p.motor 91 erection of above 8” pump & above 40 h.p.motor 92 dismantling, fabrication, erection of sulphur furnace ( complete ) 93 dismantling, fab. & erection of the melter / receiver of sulphur furnace. 94 dismantling, fabrication & erection of shell of sulphur furnace 95 dismantling, fabrication & erection of scrubber of sulphur furnace 96 dismantling , fabrication & erection of steam jacket of sulphur furnace 97 dismantling, fabrication, erection of sulphur furnace cooler 98 dismantling, fabrication & erection of the bottom portion of weight juice tank with ms plates 99 dismantling, fabrication & erection of the scrappers of dorr clarifier with ms plates 100 dismantling, fabrication & erection of the catcher bottle of vac. filter with ms plates 101 dismantling, fabrication & erection of the bottom of dorr clarifier with ms plates 102 dismantling, fabrication & erection of the mud tray of vac. filter with ms plates 103 dismantling, fabrication & erection of the mud tank bottom of vac. filter with ms plates 104 dismantling, fabrication & erection of the conical portion of juice / water / mud tank with ms plates 105 dismantling, fabrication & erection of ms plates of pan station shell of pans 106 dismantling, fabrication & erection of ms plates of pan station pan tops 107 dismantling, fabrication & erection of ms plates of pan station saveall 108 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 109 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 110 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 111 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels / angles / ms plate rings 112 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels / angles / ms plate rings 113 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles / pipes 114 dismantling, fab. & erection of coils of horizontal crystallizers 115 dismantling of shaft of crystallizers 116 fabrication of shaft of crystallizers 117 erectionof shaft of crystallizers 118 replacement of 3” ms coils ( including bends, flange, etc. ) of vertical crystallizers 119 dismantling, fab. & erection of arms of a crystallizers 120 replacement of coils of dorr & evaporator bodies juice coils ( dismantling, fab. & erection ) 121 replacement of coils of dorr & evaporator bodies ammonia & gas coils ( dismantling, fab. & erection ) 122 replacement of weak ms plates & cooling coils of molasses tanks bottom plates 123 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 124 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 125 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 126 dismantling, fabrication, erection of ms pipe coil fitting at various station 127 fabrication of drum internal plates of boiler 128 dismantling, fabrication and erection of expansion joints of boiler 129 dismantling of existing transient heaters 130 erection of new / existing transient heaters 131 dismantling / fab. / erection of weak portion of partition plates of juice heaters 132 dis of bagasse belt conveyor ( only mechanical parts ) 133 dismantlingof spurger of juice sulphiter for cleaning 134 fabricationof spurger of juice sulphiter for cleaning 135 erection / refitting.of spurger of juice sulphiter for cleaning 136 dis, fab & erection of strainer of injection pump / spray pump 137 injection channel jail dismantling, fab. & erection. 138 repairing of agitator of vaccum filter dismantling, fab. & erection. 139 fabrication of sweeper trolley 140 repairing / changing of vertical crystallizer arms in top gutter ( scrapper type ) round shape 141 etp middle shaft repairing / replacement 142 fab of new lime tank with its shaft, stirer etc. at etp 143 dismantling, fab & erection of save all of evaporator bodies 144 replacement of juice sulphiter top 145 dismantling of vibro screen 146 fabriaction of vibro screen 147 erection of vibro screen 148 repairing / replacement of shell of sugar melter 149 replacement of shaft of sugar melter 150 replacemnet of arm of sugar melter 151 stair case ( with chequared plate ) dismantling 152 stair case ( with chequared plate ) fabrication 153 stair case ( with chequared plate ) erection 154 labour supply ( per day 8 hours basis ) fitter 155 labour supply ( per day 8 hours basis ) welder 156 labour supply ( per day 8 hours basis ) helper 157 labour supply ( per day 8 hours basis ) khalasi 158 juice heater cover dismantling, fab. & erection 159 juice heater refitting with testing by pump. 160 sight glass fitting in condensate bottle of seed & juice heaters / any vessel, by welding the sight glass. 161 dismantling, fabrication, erection of stainer of injection and spray pump 162 stair case at sugar bin fabrication & erection. 163 vaccum crystallizer shell fabrication, erection & patch. 164 fitting of planetary gear boxes for b massecuite crystallizer. 165 f.d. old impeller is to be removed and new is to be fitted and trial. 166 straightening of old pipe line of thickness 6 8mm into plain sheet by rolling machine 167 to provide slide gate at b.c. or desired size with rack &pinion. 168 to provide a tapering suit under idler of b.c. to remove the falling bagasse in bagasse year. 169 pan no. 4 mechanical circulator is to be dismantled and parts to be shifted to w 170 pan no. 4 mechanical circulator to be dismantled and parts to be shifted to workshop for machining. after machining the same circulator parts to be fitted and trial. 171 pan / quad condenser tail pipe double support is to be provided with at least l 3” / pipe 2.1 / 2” with clamp system. 172 rorimelter is to be fabricated and erected as per drg. 173 replacement of id fan ducting & casing. 174 ss condenser repairing by support to be given by rings 175 clear juice filter arrangement by jali fitting dismantling, fabrication, erection 176 dismantling, fabrication, erection of strengthening of factory column, structure, channel, beam etc. 177 juice heater header partition plate top & bottom both side dismantling, fabrication, erection 178 oliver filter tray dismantling, fabrication, erection 179 centrifugal machine strengthning dismantling, fabrication & fitting from channel, beam 180 dismantling, erection of ss tail pipe at pan & quad condenser 181 dismantling, fabrication, erection tail pipe support angle channel 182 dismantling, fabrication and erection of boiler furnace 183 dismantling , fabrication and erection of mud mixture with screw conveyor 184 modification of steam jacket of pan 185 dismantling, fab and erection of hopper tray 186 dis, fab & erection of pugmill 187 dis, fab & erection of magma mixture 188 dis, fab & erection of con c / f machine chute...

Meham Cooperative Sugar Mills Limited - Haryana

16217445 tender for fabrication jobs b fabrication c erection 52 replacement of 3” ms coils (including bends, flange, etc.) of vertical crystallizers 53 dismantling, fab. & erection of arms of a crystallizers 54 replacement of coils of dorr & evaporator bodies a juice coils (dismantling, fab. & erection) b ammonia & gas coils (dismantling, fab. & erection) 55 replacement of weak ms plates & cooling coils of molasses tanks a bottom plates b side plates upto height 10mtr c top cone plates with supports d cooling coils 56 fabrication of drum internal plates of boiler 57 dismantling, fabrication and erection of expansion joints of boiler 58 erection of transient heaters a dismantling of existing transient heaters b shifting of new transient heater at site c erection of new/ existing transient heaters 59 dismantling/ fab./ erection of weak portion of partition plates of juice heaters 60 dis./ repairing/ fabrication & erection of bagasse belt conveyor on turnkey basis 61 dismantling & refitting of spurgar of juice sulphitor for cleaning a dismantling b fabrication c erection/refitting. 62 dis, fab & erection of stainer of injection pump/spray pump 63 injection channel jail dismantling, fab. & erection. 64 repairing of agitator of vaccum filter dismantling, fab. & erection. 65 fabrication of sweeper trolly 66 repairing/ changing of vertical crystallizer arms in top gutter (scrapper type) round shape 67 etp middle shaft repairing/ replacement 68 fab of new lime tank with its shaft, stirer etc. at etp 69 dismantling, fab & erection of save all of evaporator bodies 70 replacement of juice sulphiter top 71 fabrication & fitting of vibro screen a dismantling b fabriaction c erection 72 repairing of sugar melter a repairing/ replacement of shell of sugar melter b replacement of shaft of sugar melter c replacemnet of arm of sugar melter 73 stair case (fab. with chequared plate) a dismentling b fabrication c erection ...

Meham Cooperative Sugar Mills Limited - Haryana

16073222 tender for fabrication job 102 dismantling, fabrication & erection of ms plates of pan station shell of vac. crystallizer 103 dismantling, fabrication & erection of ms plates of pan station bottom plates of syrup & molasses tanks & conditioners 104 dismantling, fabrication & erection of ms plates of pan station side plates of syrup & molasses tanks & conditioners 105 dismantling, fabrication & erection of ms plates of pan station pan shell strengthening work with ms channels/ angles/ ms plate rings 106 dismantling, fabrication & erection of ms plates of pan station top cone strengthening work with ms channels/ angles/ ms plate rings 107 dismantling, fabrication & erection of ms plates of pan station strengthening of vapour line by inner side supporting of angles/ pipes 108 dismantling, fab. & erection of coils of horizontal crystallizers 109 dismantling of shaft of crystallizers 110 fabrication of shaft of crystallizers 111 erectionof shaft of crystallizers 112 replacement of 3” ms coils (including bends, flange, etc.) of vertical crystallizers 113 dismantling, fab. & erection of arms of a crystallizers 114 replacement of coils of dorr & evaporator bodies juice coils (dismantling, fab. & erection) 115 replacement of coils of dorr & evaporator bodies ammonia & gas coils (dismantling, fab. & erection) 116 replacement of weak ms plates & cooling coils of molasses tanks bottom plates 117 replacement of weak ms plates & cooling coils of molasses tanks side plates upto height 10mtr 118 replacement of weak ms plates & cooling coils of molasses tanks top cone plates with supports 119 replacement of weak ms plates & cooling coils of molasses tanks cooling coils 120 dismantling, fabrication, erection of ms pipe coil fitting at various station 121 fabrication of drum internal plates of boiler ...

Milk Union - Haryana

11851498 supply , installation and commissioning of ammonia gas receiver 1200 kg capacity along with all accessories and liquid line accumulator...

Milk Producers Federation Ltd - Haryana

11668375 tender for supply, installation and commissioning of ammonia gas receiver, 1200 kg. capacity alongwith all accessories and liquid line accumulator...

Rohtak Co-Operative Milk Producers Union Limited - Haryana

10333529 annual rate contract for supply of anhydrous ammonia gas with a proof of basic rate of raw material, ball bearing indian and imported, electrical material abb make line protection devices abb low voltage product pvc wire pvc armored cable make gloster / gemscable ) pvc flexible cable l and t make switch gear, borosil brand glass wares, bdh / glaxo / sd fine / e marck chemical....

Co-Op Milk Producers Union Lid - Haryana

7977320 anhydrous ammonia gas with proof of basic rate of raw materails,2) ball baring indian and imported (skf) on current price list , electric material i.e. indo asian , abb make line protection devices , abb low voltage product , pvc wire , pvc armored cable , pvc flexible cable , l&t make switch gear on current price list, borosil brand glass wares on current price list , bdh / glaxo / qualigene/ sd fine / e marck chemical on company current price list....

Rohtak Cooperative Milk Producers Union Limited - Haryana

6113318 1.supply of anhydrous ammonia gas with a proof of basic rate of raw material. 2. ball baring indian and imported skf on co. s current price list. 3. electricmaterial i.e standard make switch gear, abb make line protection devices, abb low voltage product, pvc wire make standard esc havells pvc armored cablemake gloster gemscable, pvc flexible cable make standard esc havells l and t make mpcb, timer micron, push button station, rotary switch and switch gear on cos current price list....

Rohtak Cooperative Milk Producers Union Limited - Haryana

5962765 annual rate contract for (i)bdh/glaxo/qualigene/sd> fine/e> merck chemical on co. current price list. (ii) borosil brand glass wares on co.s current price list. (iii) whatman filter paper no.4 of size 12.5 c.m. on co.s current price list. 2. anhydrous ammonia gas with a proof of basic rale of raw material. 3. ball baring indian and imported (skf) on co.’s currtent price list. 4. electric material i.e. standard make switch gear, abb make line protection devices. abb low voltage product, pvc wire (make standara/esc/havelll’s), standard/esc/havell/s. l&t ,mako: timer micron, push button station, roatary swith and switch gear on co.s current price list....